Period
December 2014 – September 2015
Location
Rumaila Oil field, Basra
Client
Saipem, Iraq
SCOPE OF WORK
The work included the following :
- Details engineering.
- Supply fitting and valves
- Shop fabrication
- Erection the fabricated pipes
- NDT and Hydrotest Works
- Painting testing
- Erection the steel structure
- Testing and commissioning