• +964 784 1583 841
  • Baradiya, Near Turkish Consulate. Basra. Iraq
  • info@mbiraq.com

Archives: Projects

Mechanical, Electrical and Instrumentation Works

The work included the: Fabrication and Installation Piping and UG pipe line, installation and commissioning the electrical works …

Fabrication and Installation Flowlines and Piping

The work included the: Fabrication and Installation of the Concrete Footing, Erection of the Steel Members …

Piping and Pipe Line Works

The work is included the: Details Engineering, Supply of Fitting and Valves, Shop Fabrication, Erection of the Fabrcicated Pipes …

Installation Train (C) Pipe Rack

The work is included the: Installation of Rotating Equipment (High/Medium Gas Compressor (6 Units) …

Fabrication and Installation of Train A Piping System

The work is included the: Installation of Rotating Equipment (High/Medium Gas Compressor (6 Units) …

Mechanical, Electrical and Instrumentation works

The work is included the: Installation of Rotating Equipment (High/Medium Gas Compressor (6 Units) …

Mechanical, Electrical and Installation Works

The work is included the: Installation of Rotating Equipment (High/Medium Gas Compressor (6 Units) …