Period
January 2012 – June 2013
Location
Badra Oil Field , Iraq
Client
Petrofac Limited
SCOPE OF WORK
The work including but not limited the following :
- Design , fabrication and installation and testing piping system .
- Supplying all missing materials such as ( pipes , fitting , flanges , valves , etc…)
- Sand blasting and painting all the fabricated piping system .
- Supplying , fabrication and installation all kind of steel pipe supports .