Period
April 2010 – August 2011
Location
Garraf Oil Field, Thi Qar
Client

PETRONAS /UMM SGSB, Iraq

SCOPE OF WORK

The works is including but not limited :

  • Supplying pipe line and fitting with valves .
  • Fabrication and Installation
  • Testing and Commissioning