Period
December 2014 – September 2015
Location
Rumaila Oil field, Basra
Client
Saipem, Iraq

SCOPE OF WORK

The work included the following :

  • Details engineering.
  • Supply fitting and valves
  • Shop fabrication
  • Erection the fabricated pipes
  • NDT and Hydrotest Works
  • Painting testing
  • Erection the steel structure
  • Testing and commissioning