The work included the: Fabrication and Installation Piping and UG pipe line, installation and commissioning the…
Fabrication and Installation Flowlines and Piping
The work included the: Fabrication and Installation of the Concrete Footing, Erection of the Steel Members…
Piping and Pipe Line Works
The work is included the: Details Engineering, Supply of Fitting and Valves, Shop Fabrication, Erection of…
Installation Train (C) Pipe Rack
The work is included the: Installation of Rotating Equipment (High/Medium Gas Compressor (6 Units) ...…
Fabrication and Installation of Train A Piping System
The work is included the: Installation of Rotating Equipment (High/Medium Gas Compressor (6 Units) ...…
Mechanical, Electrical and Instrumentation works
The work is included the: Installation of Rotating Equipment (High/Medium Gas Compressor (6 Units) ...…
Mechanical, Electrical and Installation Works
The work is included the: Installation of Rotating Equipment (High/Medium Gas Compressor (6 Units) ...…